Factory claims are useful only when they connect to the product being purchased. LEDHAFOND keeps the quality discussion tied to the approved configuration and shipment scope.
Configuration control
Series, pitch, cabinet layout, module type, receiving card and power configuration are confirmed before production release.
Assembly review
Cabinet fit, module alignment, cable routing and replaceable components are checked against the production requirement.
Aging and calibration
Display operation, uniformity and identified defects are reviewed before packing. Project-specific records should be confirmed with the order.
Shipment handoff
Packing list, spares, drawings and remote guidance scope are aligned with the buyer and local installer.