Architectural LED displays must fit the building before they can perform as media. The correct system depends on elevation geometry, structural loading, daylight, viewing distance and the route technicians will use after installation.
Inputs that change the design
- Elevation drawings and usable mounting zones
- Closest and typical viewing distance
- Daylight direction and required operating hours
- Wind, rain, dust and local design conditions
- Front, rear or walkway service access
- Power distribution and control-room location
What the proposal should show
A project-ready proposal should state the cabinet or module grid, service direction, structural interface, power and data concept, access assumptions and any items that still require local engineering confirmation.